Long-line dishwasher ED-10000
+
  • Long-line dishwasher ED-10000

Long-line dishwasher ED-10000

Keyword:

Long-line dishwasher ED-10000

The long-line type dishwasher, using the module dexterity combination design, powerful, convenient for different customers with different needs customers can be customized according to their own requirements for the use of the actual size of the kitchen dishwasher.

Descriptions


Product Characteristics

The long-line type dishwasher, using the module dexterity combination design, powerful, convenient for different customers with different needs customers can be customized according to their own requirements for the use of the actual size of the kitchen dishwasher.
The heater power can be selected according to the different temperature of incoming water. The dryer module can be flexible according to the material of washing dishes.
The washing capacity of this website is based on the 18-inch fast food plate as the reference capacity.
Inlet pipe diameter:6 points(20mm).
Drain pipe diameter:2 inch(50mm).
Inlet pressure: 1.055kg/m2~1.76kg/m2, preferably 1.4kg/m2, more than 1.76kg/m2 need to install a pressure reducing valve (provided by other companies).
Inlet water temperature:10-50°C.
Inlet water hardness:0.034~0.103g/l.
Cable specification:National standard 35 square millimeters (three-phase four-wire).
10-50°C water inlet.

 

Are you a trading company or factory?

We are a kitchen equipment factory in Shandong province.

What's the MOQ of your products? Can I have a sample order?

Our MOQ is one container.Yes,we can offer sample firstly.

How is the quality of the products?

All the equipment are equipped with high quality spare parts to ensure the whole quality, safe,stable and pretty.

How to proceed if I want to print my own logo?

First,please offer your logo design drawing and the position of the logo,next we will make a sample, then sample picture or send sample to you for confirmation, finally we will go ahead for mass production.

How about your packaging? Can you offer OEM packaging?

Carton packing or wooden frame packing . Yes, OEM packing alsowelcomed.

What's the lead time?

For samples is 3~7 days,mass production time is 25days after payment with one container.

You may like